Meeting set on Hilltop widening project | News | jonesborosun.com

2022-11-15 16:23:43 By : Mr. Charlie luo

Please log in, or sign up for a new account and purchase a subscription to continue reading.

We have used your information to see if you have a subscription with us, but did not find one. Please use the button below to verify an existing account or to purchase a new subscription.

Your current subscription does not provide access to this content. Please use the button below to manage your account.

One Day: 1.50 4 Weeks: 18.80 12 Weeks: 56.40 24 Weeks: 112.80 52 Weeks: 244.40

Verify your print or online subscription account here. Full week print subscribers are entitled to FREE unlimited online and eEdition access through The Jonesboro Sun All-Access.

Verify your Times Dispatch print or online subscription account here. Get access to weekly electronic editions and all Times Dispatch web content. To purchase a subscription to The TD, call 870-886-2464.

Please log in, or sign up for a new account to continue reading.

Thank you for reading! We hope that you continue to enjoy our free content.

Welcome! We hope that you enjoy our free content.

Thank you for reading! On your next view you will be asked to log in or create an account to continue reading.

Thank you for reading! On your next view you will be asked to log in to your subscriber account or create an account and subscribe purchase a subscription to continue reading.

Thank you for signing in! We hope that you continue to enjoy our free content.

Thank you for reading! We hope that you continue to enjoy our free content.

Thank you for reading! We hope that you continue to enjoy our free content.

Thank you for reading! We hope that you continue to enjoy our free content.

Thank you for reading! We hope that you continue to enjoy our free content.

Thank you for reading! We hope that you continue to enjoy our free content.

Checking back? Since you viewed this item previously you can read it again.

Please log in, or sign up for a new account and purchase a subscription to continue reading.

Please purchase a subscription to continue reading.

Your current subscription does not provide access to this content.

One Day: 1.50 4 Weeks: 18.80 12 Weeks: 56.40 24 Weeks: 112.80 52 Weeks: 244.40

Verify your print or online subscription account here. Full week print subscribers are entitled to FREE unlimited online and eEdition access through The Jonesboro Sun All-Access.

Verify your Times Dispatch print or online subscription account here. Get access to weekly electronic editions and all Times Dispatch web content. To purchase a subscription to The TD, call 870-886-2464.

Sorry, no promotional deals were found matching that code.

Promotional Rates were found for your code.

Partly cloudy skies. High 48F. Winds NW at 10 to 20 mph..

Considerable clouds early. Some decrease in clouds late. Low around 30F. Winds NW at 5 to 10 mph.

JONESBORO — Two public meetings are scheduled next week to discuss upcoming road projects in the area, including the proposed widening of Arkansas 351 at Hilltop.

From 5 to 6:30 p.m., the Northeast Arkansas Regional Transportation Planning Commission will host a public forum to discuss the projects outlined in the upcoming 2023-2026 Transportation Improvement Program.

A draft of the complete document is set to be released early next week for public comment, Alan Pillow, the commission’s executive director said.

That meeting will be held in the first floor conference room of the Jonesboro Municipal Center, 300 S. Church St.

On Thursday, the Arkansas Department of Transportation (ArDOT) will conduct an in-person public involvement meeting about the proposed widening of Arkansas 351 at Hilltop.

That meeting will occur from 4 to 7 p.m. at the Family Fellowship Baptist Church (Family Life Center), 2441 North Old Greensboro Road.

The plans call for widening the road from two to five lanes from Pleasant View Drive to north of Peachtree Avenue. It will include four 11-foot travel lanes with one 12-foot, two-way left turn lane, and curb and gutter. The east side of the highway will include a five-foot-wide sidewalk and the west side will include a 10-foot-wide side path.

The project also includes installing a storm sewer system, extending and replacing existing cross drain pipes, erosion control, earthwork and asphalt concrete hot mix pavement.

A link providing more detailed information can be found at: https://vpiph03-job-101135 -en-ardot.hub.arcgis.com/

The project website will provide a video presentation, the ability to view and download meeting materials and exhibits and a place to provide online comments. All exhibits and information presented on the website will also be available at the in-person meeting.

The public may view meeting materials and provide written comments until 4:30 p.m. on Dec. 2.

Success! An email has been sent to with a link to confirm list signup.

Error! There was an error processing your request.

Would you like to receive our daily news? Signup today!

Sorry, there are no recent results for popular videos.

Sorry, there are no recent results for popular commented articles.